Filter By

Categories

Categories

Minimum players

Minimum players

Maximum players

Maximum players

Average game length

Average game length

Minimum age

Minimum age

Language

Language

Difficulty level

Difficulty level

Mechanism

Mechanism

Category

Category

Home

Home

Active filters

  • Minimum players: 2
  • Average game length: 120 min
  • Difficulty level: Advanced
  • Mechanism: Alliances
  • Mechanism: Market
Power Grid:...
  • -25%
  • -25%

Power Grid: Australia/Indian Subcontinent

£11.21 £14.95
Free Shipping

Power Grid: Australia & Indian Subcontinent includes two new maps for Power Grid: Recharged or Power Grid.

The Australia map challenges players with several independent power networks.  Players now the ability to sell uranium.

The Indian Subcontinent map offers a more restrictive resource market.  It can punish players who expand too quickly with power outages!

Availability: In stock
Power Grid: Russia/Japan
  • -25%
  • -25%

Power Grid: Russia/Japan

£11.21 £14.95
Free Shipping

Power Grid: Russia / Japan includes two new maps for Power Grid: Recharged or Power Grid.

Russia: This map features a restricted market for power plants. Additionally, the standard rules for exchanging out of date power plants are changed.  The players are forced to completely rethink their strategies.

Japan: Based on the crowded geographical surroundings, the players can start two separate networks in Japan. The first connections are restricted to certain cities, guaranteeing a tough fight for the best networks.

Availability: In stock
Power Grid: France/Italy
  • -25%
  • -25%

Power Grid: France/Italy

£11.21 £14.95
Free Shipping

Power Grid: France & Italy includes two new maps for Power Grid: Recharged or Power Grid.

Along with the maps are small rule changes to reflect the power culture in these two countries.

Availability: In stock
Power Grid:...
  • -25%
  • -25%

Power Grid: Québec/Baden-Württemberg

£11.21 £14.95
Free Shipping

Power Grid: Québec & Baden-Württemberg includes two new maps  for Power Grid: Recharged or Power Grid.

Québec offers ecological power plants that stay on the market longer.  This makes it easier for players to acquire these plants that consume no resources.

Availability: In stock
Pipeline
  • -30%
  • -30%

Pipeline

£48.97 £69.95
Free Shipping

The refinement of oil has long been part of the government-controlled energy sector. Amassed with an incredibly complex and inefficient system of refineries, the government has felt the severe pressures of worldwide demand and the ever-increasing global standards for refinement. Unable to keep up with demand, the government has only one option: privatizing the oil industry.

Availability: Out of Stock
Power Grid: China/Korea
  • -25%
  • -25%

Power Grid: China/Korea

£11.21 £14.95
Free Shipping

Power Grid: Korea & China includes two new maps  for Power Grid: Recharged or Power Grid.

The Korea map comes with two separate resource markets (North/South).

The China map has rules for the planned economy in China – power plants come out in ascending order during step 1 and step 2.

Availability: Out of Stock
Power Grid: Recharged
  • -23%
  • -23%

Power Grid: Recharged

£38.46 £49.95
Free Shipping

Power Grid: Recharged is the updated version of the classic economic game, in which 2-6 players vie to build the biggest power-generation network.

What better way to earn money than with electric power?!! But how should you do it? Will you use old-fashioned coal or oil? Maybe you’ll be at the forefront of burning garbage. Nuclear power is tempting, as long as you can acquire uranium

Availability: Out of Stock