Filter By

Minimum players

Minimum players

Maximum players

Maximum players

Average game length

Average game length

Minimum age

Minimum age

Difficulty level

Difficulty level

Mechanism

Mechanism

Category

Category

Thematic

Thematic

There are 37 products.

Active filters

  • Category: Civilization
  • Category: Industry / Manufacturing
Power Grid: France/Italy
  • -25%
  • -25%

Power Grid: France/Italy

£11.21 £14.95
Free Shipping

Power Grid: France & Italy includes two new maps for Power Grid: Recharged or Power Grid.

Along with the maps are small rule changes to reflect the power culture in these two countries.

Availability: In stock
Power Grid:...
  • -25%
  • -25%

Power Grid: Québec/Baden-Württemberg

£11.21 £14.95
Free Shipping

Power Grid: Québec & Baden-Württemberg includes two new maps  for Power Grid: Recharged or Power Grid.

Québec offers ecological power plants that stay on the market longer.  This makes it easier for players to acquire these plants that consume no resources.

Availability: In stock
Rails of New England
  • -40%
  • -40%

Rails of New England

£35.97 £59.95
Free Shipping

New England Rails is a business game set in 19th century New England for two to five players. Each player takes on the role of a would-be business tycoon seeking to increase profits by expanding business holdings and connecting them by railroad to major cities.

Availability: Last items in stock
Twilight Imperium 4th Ed.
  • -25%
  • -25%

Twilight Imperium 4th Ed.

£123.71 £164.95
Free Shipping

Twilight Imperium 4th Ed. 

For two decades, Twilight Imperium has thrilled gamers with its grand storytelling and tactical strategy. Now players can explore the next step in the Twilight Imperium Legacy with Twilight Imperium Fourth Edition, an epic game of galactic conquest for three to six players.

Availability: Out of Stock
Power Grid: China/Korea
  • -25%
  • -25%

Power Grid: China/Korea

£11.21 £14.95
Free Shipping

Power Grid: Korea & China includes two new maps  for Power Grid: Recharged or Power Grid.

The Korea map comes with two separate resource markets (North/South).

The China map has rules for the planned economy in China – power plants come out in ascending order during step 1 and step 2.

Availability: Out of Stock