Filter By

Minimum players

Minimum players

Maximum players

Maximum players

Average game length

Average game length

Minimum age

Minimum age

Difficulty level

Difficulty level

Mechanism

Mechanism

Category

Category

Thematic

Thematic

Active filters

  • Category: Farming
  • Category: Industry / Manufacturing
High Frontier 4 All
  • -10%
  • -10%

High Frontier 4 All

£71.96 £79.95
Free Shipping

This is the 4th ed of Phil Eklund\'s signature game High Frontier. It started with Rocket Flight (1999), a game with the vision to let "Each player start as a spacefaring company in the year 2020 trying to make a profit in trade and technology development." Now that we are at that year, High Frontier has evolved into a modular system open to enthusiasts to keep it updated ever farther into the future.

Availability: In stock
Above and Below
  • -23%
  • -23%

Above and Below

£38.46 £49.95
Free Shipping

Above and Below is a mashup of town-building and storytelling where you and up to three friends compete to build the best village above and below ground. In the game, you send your villagers to perform jobs like exploring the cave, harvesting resources, and constructing houses. Each villager has unique skills and abilities, and you must decide how to best use them. You have your own personal village board, and you slide the villagers on this board to various areas to indicate that they\'ve been given jobs to do. Will you send Hanna along on the expedition to the cave? Or should she instead spend her time teaching important skills to one of the young villagers?

Availability: In stock
Power Grid:...
  • -25%
  • -25%

Power Grid: Australia/Indian Subcontinent

£11.21 £14.95
Free Shipping

Power Grid: Australia & Indian Subcontinent includes two new maps for Power Grid: Recharged or Power Grid.

The Australia map challenges players with several independent power networks.  Players now the ability to sell uranium.

The Indian Subcontinent map offers a more restrictive resource market.  It can punish players who expand too quickly with power outages!

Availability: In stock
Power Grid: Russia/Japan
  • -25%
  • -25%

Power Grid: Russia/Japan

£11.21 £14.95
Free Shipping

Power Grid: Russia / Japan includes two new maps for Power Grid: Recharged or Power Grid.

Russia: This map features a restricted market for power plants. Additionally, the standard rules for exchanging out of date power plants are changed.  The players are forced to completely rethink their strategies.

Japan: Based on the crowded geographical surroundings, the players can start two separate networks in Japan. The first connections are restricted to certain cities, guaranteeing a tough fight for the best networks.

Availability: In stock
Power Grid: France/Italy
  • -25%
  • -25%

Power Grid: France/Italy

£11.21 £14.95
Free Shipping

Power Grid: France & Italy includes two new maps for Power Grid: Recharged or Power Grid.

Along with the maps are small rule changes to reflect the power culture in these two countries.

Availability: In stock
Power Grid:...
  • -25%
  • -25%

Power Grid: Québec/Baden-Württemberg

£11.21 £14.95
Free Shipping

Power Grid: Québec & Baden-Württemberg includes two new maps  for Power Grid: Recharged or Power Grid.

Québec offers ecological power plants that stay on the market longer.  This makes it easier for players to acquire these plants that consume no resources.

Availability: In stock
Rails of New England
  • -40%
  • -40%

Rails of New England

£35.97 £59.95
Free Shipping

New England Rails is a business game set in 19th century New England for two to five players. Each player takes on the role of a would-be business tycoon seeking to increase profits by expanding business holdings and connecting them by railroad to major cities.

Availability: Last items in stock
Power Grid: China/Korea
  • -25%
  • -25%

Power Grid: China/Korea

£11.21 £14.95
Free Shipping

Power Grid: Korea & China includes two new maps  for Power Grid: Recharged or Power Grid.

The Korea map comes with two separate resource markets (North/South).

The China map has rules for the planned economy in China – power plants come out in ascending order during step 1 and step 2.

Availability: Out of Stock