Thematic

Thematic

Active filters

  • Maximum players: 6
  • Mechanism: Market
Power Grid:...
  • -25%
  • -25%

Power Grid: Australia/Indian Subcontinent

£11.21 £14.95
Free Shipping

Power Grid: Australia & Indian Subcontinent includes two new maps for Power Grid: Recharged or Power Grid.

The Australia map challenges players with several independent power networks.  Players now the ability to sell uranium.

The Indian Subcontinent map offers a more restrictive resource market.  It can punish players who expand too quickly with power outages!

Availability: In stock
Power Grid: Russia/Japan
  • -25%
  • -25%

Power Grid: Russia/Japan

£11.21 £14.95
Free Shipping

Power Grid: Russia / Japan includes two new maps for Power Grid: Recharged or Power Grid.

Russia: This map features a restricted market for power plants. Additionally, the standard rules for exchanging out of date power plants are changed.  The players are forced to completely rethink their strategies.

Japan: Based on the crowded geographical surroundings, the players can start two separate networks in Japan. The first connections are restricted to certain cities, guaranteeing a tough fight for the best networks.

Availability: In stock
Power Grid: France/Italy
  • -25%
  • -25%

Power Grid: France/Italy

£11.21 £14.95
Free Shipping

Power Grid: France & Italy includes two new maps for Power Grid: Recharged or Power Grid.

Along with the maps are small rule changes to reflect the power culture in these two countries.

Availability: In stock
Power Grid:...
  • -25%
  • -25%

Power Grid: Québec/Baden-Württemberg

£11.21 £14.95
Free Shipping

Power Grid: Québec & Baden-Württemberg includes two new maps  for Power Grid: Recharged or Power Grid.

Québec offers ecological power plants that stay on the market longer.  This makes it easier for players to acquire these plants that consume no resources.

Availability: In stock
Power Grid: China/Korea
  • -25%
  • -25%

Power Grid: China/Korea

£11.21 £14.95
Free Shipping

Power Grid: Korea & China includes two new maps  for Power Grid: Recharged or Power Grid.

The Korea map comes with two separate resource markets (North/South).

The China map has rules for the planned economy in China – power plants come out in ascending order during step 1 and step 2.

Availability: Out of Stock